Chestnut Hill Square is back on the boards

Update: the TAB had many of the details a few weeks ago.

Update II: The Land Use report's 800,000 sq. ft. number for the previous proposal seemed high. Here's a contemporary TAB article that puts the figure at 245,000 sq. ft. plus 226 residential units. Here are my thoughts on the main subject of the article.


From the report of the May 11 Land Use committee meeting (link currently broken), New England Development is now proposing a 245,000 sq. ft. development with 90 1- and 2-bedroom residential units for Chestnut Hill Square, on the 11.5 acre site of the former Omni supermarket. That's down from 800,000 sq. ft. and 225 residential units. (See note above.) Not clear how the new development will be massed, but the report says a height of 8 stories, which is lower than the two originally proposed 14-story residential towers over the commercial space.

The 245,000 sq. ft. break down as follows:

  • 50,000 -- grocery store
  • 105,000 -- other retail/restaurant
  • 30,000 -- health club
  • 60,000 -- medical office

Note, that the residential units are in addition to the 245,000 sq. ft., not part of it (a point of some confusion the last go 'round).

Besides the (possible?) reduction in space, two other big differences -- based on this limited information: 1) programming, specifically the shift from retail/restaurant to some medical office space, and 2) a curb cut on Florence Street.

The decreased intensity of the use should please a lot of people. And, ninety residential units is still a substantial commitment to making this a mixed-use development. Among the questions to be answered as the proposal is rolled-out: how well integrated is the development. The previous version did a terrible job along the Boylston St./Route 9 side and did not offer adequate pedestrian integration with the surrounding, densely residential neighborhood. And, the curb cut on Florence Street is sure to be a source of controversy.

Why was New England Development before Land Use? To take up New England Development's offer to pay for peer-review of the traffic studies. Apparently, New England Development wants to break ground this year and paying for peer-review will move things along. Land Use authorized New England Development's request.

New England Development is planning to file for a Special Permit at the end of July, with a public hearing in September.

Read More...

Wednesday, October 3, 2007

It's not all improvements

Alderman Rick Lipof was at tonight's public hearing in Brookline. Near the close of the meeting, he encouraged the good folks of Brookline to work together with Newton to address the traffic problems in the area. Then he trotted out the New England Development line that this project will include $8 to 13 million dollars in mitigation money, some of which could be Brookline's if the town plays ball.

We've covered this ground already. New England Development, in its Final Environmental Impact Report, included a table of proposed "improvements" that total over $10 million (p. VIII-51). But, over half is allocated to projects for which New England Development, not the city or its neighborhoods, is the primary, if not exclusive, beneficiary: $5.8 million to widen Route 9 and $660,000 to create a signalized median break. As I wrote in the earlier post, these two measures won't "'help ease the expected traffic increase.' They will help create the expected traffic increase."

I'm not sure if Alderman Lipof is aware of the nature of the allocations or of the fact that the proposed changes hardly constitute unalloyed benefit to the City. Before he next lauds New England Development for its generosity, he ought to take a look.

By the way, I don't mean to suggest that New England Development is being irresponsible or stingy. Some of the $10 million is principally for mitigation. I think the City should require more money from New England Development, with the allocation skewed more towards alternative transportation. But, it ain't nothing.

Still, let's be more careful discussing the money New England Development says its willing to spend, shall we?

Previously: NED's Overstated mitigation commitment

Read More...

Wednesday, April 18, 2007

Not again with the $13 million?!?!?

Once more, the Tab uncritically repeats New England Development's assertion that $13 million worth of changes to roadways surrounding the proposed Chestnut Hill Square are "improvements." The offending paragraph:

The developer has also offered to make some road improvements to ease the impact from the possible addition, at a cost of $13 million. Expected improvements would also include traffic lights and travel lanes on both sides of Route 9 from Langley Road to the Hammond Pond Parkway.

The nice use of "offered" makes it even worse, like the only reason New England Development is spending the money is to mitigate the effects of the development on the neighborhood.

One more time, boys and girls, over half of the proposed $13 million is for changes to Route 9 that a) directly benefit New England Development and b) are not universally viewed as changes for the good.

No question, New England Development is taking the right steps to do actual mitigation. They are going to spend a bunch of money on things that are only going to mitigate. I don't want to suggest that they are shirking their responsibility.

But, the tab for mitigation isn't going to be $13 million.

Previously:
When's mitigation mitigation?
NED's Overstated mitigation commitment


Read More...

Wednesday, February 7, 2007

When's mitigation mitigation?

On the Tab's blog, Christopher Loh commendably noted my skepticism with New England Development's claim that they have committed $13.5 million to mitigation. (Mr. Loh's Tab article with the New England Development claim. My original entry questioning the mitigation.)

Mr. Loh, appropriately, turned my skepticism back on me, asking the basis for my conclusion that some claimed mitigation should not be considered mitigation. Herewith a summary of my reply ...

The key question is whether or not New England Development will realize a direct and substantial benefit from a proposed measure. If so, then it seems a bit much to suggest that it is a mitigation measure.

Looking at the signalized cut in Route 9 and the widening of Route 9 to 8 lanes, it seems pretty clear that the key beneficiary is Chestnut Hill Square. Without the cut in Route 9, some potential Chestnut Hill Square visitors will pass on a visit rather than deal with an already overloaded Langley Road turnaround. And, if you have a cut in Route 9 and lights, without the road widening you'll have congestion at the intersection from the undifferentiated mix of Chestnut Hill Square traffic and through traffic. CHS-bound cars stopped at a green light waiting to turn left will back up through traffic, which will back up CHS-bound traffic, which will ... you get the point. More disincentive to shop at CHS.

A counterfactual hypothetical might help. If the city (with the commonwealth's blessing) were to say, "We need the tax revenue so badly, we don't even care if you mitigate," would New England Development make the signalized cut in Route 9 and widen Route 9?

For $3.5 million or so, they'd be foolish not to.

Previously: NED's Overstated mitigation commitment

Read More...

Wednesday, January 31, 2007

NED's Overstated mitigation commitment

From the Chestnut Hill Square article in today's Tab:

The developer has also offered to pay nearly $13 million for improvements to Route 9 to help ease the expected traffic increase.
No! No! No!

I don't know where the $13 million figure comes from. But, New England Development's response to the city's comments on the Draft Environmental Impact Report contains a table summarizing New England Development's commitment to mitigation (FEIR, VIII-51). Of the $10.5 million committed as of the 11/15/06 date of the FEIR, over $6.5 million was allocated to two line items:
  • Provide traffic signalization and median break with two left-turn lanes on Route 9 Westbound at The Mall at Chestnut Hill Drive and at the Capital Grille Drive. ($660,000)
  • Widen Route 9 east and westbound ($5.85 million)
Those two measures won't "help ease the expected traffic increase." They will help create the expected traffic increase.

Without those two changes to Route 9 (improvements strikes me as debatable, at least), New England Development won't be able to attract as many people cars and trucks to Chestnut Hill Square.

New England Development is entitled to propose changes to Route 9 that will enhance the value of its property. But, let's not mistake self-interested investment with mitigation.

Read More...

Monday, March 26, 2007

Proposed Planned Business District

New England Development, the folks that are going to bring you Chestnut Hill Square, have proposed amending the Newton zoning ordinance to create a new district, called a Planned Business District.

In essence, the ordinance change would allow a developer (or developers) who gets control over 10 acres to create a very dense multi-use development. Call it instant village.

There's a public hearing tonight.

Multi-use development is, in most cases, better than not, though there are a load of issues with this particular proposal to create multi-use development. But, multi-use development is particularly appropriate around mass transit service. It's called smart growth.

Yet, the proposal lacks any requirement related to mass transit.

It's understandable. The creation of the Planned Business District is intended to grease the skids for Chestnut Hill Square, which will be notably underserved by mass transit. So, the New England Development-controlled property would not qualify as a Planned Business District if there were any meaningful transit requirement.

That doesn't make it acceptable. Before we go allowing the creation of new villages that are not served by mass transit, let's allow -- indeed encourage -- mixed-use development in our existing villages, each of which is well-served by some combination of bus, trolley, and commuter rail.

Or, let's make sure that creation of a new village is coincident with real extension of our transit infrastructure. Route 9 might be a pretty good place for a new urban village, just not without some new transit, which the Route 9 corridor desparately needs. In the case of Chestnut Hill Square, that might mean creation of a bus rapid transit route down Route 9.

The way to focus attention on the villages or to catalyze new mass transit is to make transit use -- 30%? 50%? -- a requirement of a Planned Business District.

Wiki page: Arguments Against Planned Business District

Read More...

Tuesday, June 12, 2007

Trip generation maximums

Went to an aldermen committee meeting and a thoughtful discussion about mixed-use zoning broke out.

I kid.

But in all seriousness, last night's consideration of the proposed Planned Business District was particularly thoughtful, with a bunch of important points raised and considered. I'll post about some of them over the next few days (here and on the Garden City blog).

Let me start with maximums on trip generation, presented last night as post-construction traffic study.

Under a trip-generation maximum scheme, before construction the city and developer would agree on reasonable trip generation for the project, based on projections. Some time after construction and occupancy, the city and developer will measure actual trip generation. If the actuals are too much higher (say 10%) than the estimates, the developer will take measures to reduce trip generation.

As Phil Herr pointed out quite eloquently at the second public hearing on New England Development's PBD proposal, when a developer offers pre-construction trip projections, he implicitly acknowledges that the development can be profitable with those number of trips. Enforceable maximums take the implicit and turn it into a commitment. The city will permit a sufficient number of trips to allow the developer to succeed. The developer promises to limit development to those number of trips.

The key insight is that trip generation can be managed. There are all sorts of mechanisms, primarily on-site, that can discourage visitors: higher parking fees, reduced parking, programs to encourage alternative transportation, &c. And, there's always the nuclear bomb: forced vacancy.

A good point of reference is New England Development's attorney John Twohig question last night: If one of the tenants is particularly successful, am I supposed to tell him, sorry, you're too successful, gotta shut you down? (I'm paraphrasing.)

Attorney Twohig overloads the question with assumptions, so let's break it down.

If a tenant is so unexpectedly successful that trip generation goes over the developer's commitments, is the developer going to have to do something?

Yes. The trip-generation limit represents a bargain between the community and the developer. A developer can create enough traffic to make a project successful, but no more. If a developer -- and its tenants -- want to make more money, they have to figure out how to bring customers to the site by other means.

I think board President Lisle Baker was quite clear on this point. The developer is going to be forced to live up to his trip generation commitments. Among other things, excess trip generation is a sign of over capacity. Should the neighborhood and the city be denied the benefit of the bargain because the developer overbuilt?

If a tenant is unexpectedly successful, is the landlord going to have to shut him down?

No. Only if the developer has grossly miscalculated and has overbuilt will such an extreme measure be necessary. Attorney Twohig's question ignores all the less extreme steps the developer can take to reduce trips. For instance, raising parking fees.

We know that the cost of parking affects has an impact on driving decisions. If parking fees go up, fewer people will come. Raise them high enough and trip generation should fall below the commitment.

If a tenant is unexpectedly successful, is the landlord going to have to limit his success?

Maybe. If the development relies on vehicle traffic to bring customers, then yes, reducing trip generation is going to limit the opportunity for profit. At first blush, this sounds odd, perhaps even unfair. But, there is a growing awareness that neighborhoods and the city as a whole pay a price for unlimited traffic. That price amounts to a subsidy to the developer and the tenants. Traffic limits put an end to that subsidy. Developers and their tenants are going to have to make do with limits on what has been an unlimited resource.

Ultimately, the question as Attorney Twohig phrased it reveals a lack of imagination. It assumes the limitation of car-dependency.

A trip generation maximum is not a limit on the number of customers that can patronize the development. It is a limit on how they get there. If the development exceeds its trip generation commitment, the appropriate response is not to figure out how to prevent people from coming to the property. The right response is to figure out how to get more people there by bus, trolley, bike, and foot.

(On a topic I'll address in more detail later, another response is to figure out how to maximize visits by people who live within walking distance. Clue: day-to-day amenities.)

Ultimately, trip-generation limits align the developers' and the City's interest in alternative transportation. If there is a limit on the number of customers who can arrive at a development by car, the developer will become a strong advocate for other ways to get them into the stores and restaurants.

In later posts, I'll address related issues, like parking maximums and mitigating unexpected effects of post-construction traffic.

Read More...

Friday, July 6, 2007

What if ...

Instead of asking for improvements and mitigations from a developer like New England Development (at Chestnut Hill Square), the City asked for a one-time payment to do the work itself?

To the extent that improvements were for the benefit of motorists and mitigations to minimize the effect of motorists, the work done would constitute a developer-funded subsidy to motorists.

The outcome is no different when there's no money being exchanged and the developer does the work himself as a condition of getting approval from the city.

So, as we think about the Planned Multi-Use Business Development, which lists as its criteria substantial roadway improvements, and we think about the likely Chestnut Hill Square special permit application, related to which New England Development will tout its $13 million plus roadway improvements, we should be asking ourselves, "Why the enormous subsidy for motorists?"

What if the City, through developers or on its own, radically cutback the subsidy for car travel and re-allocated it to transit improvements?

Read More...

Thursday, October 4, 2007

Getting Florence/Heath unbackwards

What if, regarding Heath and Florence Streets, Chestnut Hill Square is not the problem, but a potential solution?

A staggering 95% of current (2004) weekday peak hour Florence/Heath eastbound traffic is cut-through traffic. In New England Development's Final Environmental Impact Report, the traffic study for the weekday evening peak hour traffic show that 474 cars enter Florence from Route 9 Boylston. (Appendix D, figure 5.) All but 25 continue on to Heath and Hammond Pond Parkway. Westbound, about half the 171 cars that enter Heath at Hammond Pond continue on to Route 9 Boylston.

New England Development's projected eastbound figures for 2010 post-build are 513/14, or over 97%. (Appendix D, figure 21.) Westbound about 80% of the 151 cars that start at Heath and Hammond Pond Parkway will be cut through.

No wonder Brookline wants to close Heath Street. If you could get rid of 513 cars an hour while only inconveniencing a handful, wouldn't you do it? (The key is that everyone agrees those 513 cars really ought to be on Route 9 Boylston and Hammond Pond Parkway.)

What's really mind-blowing, though, is a comparison of the projected cut-through traffic along Heath/Florence and total projected traffic in and out of Chestnut Hill Square. According to the FEIR, during peak weekday hours, the site will generate 1349 trips, in and out.

Imagine reconfiguring Florence Street such that it was no longer an attractive cut-through and it provided an entrance into Chestnut Hill Square. Florence and Heath would have to absorb more than a third of the Chestnut Hill Square traffic to equal the existing cut-through traffic. Trade the cut-through traffic for a Chestnut Hill Square entrance and you'd also end up with a Chestnut Hill Square that is much better integrated into the neighborhood.

In part, this is what Brookline is proposing by blocking Heath Street. There will be no more cut-through traffic. And, most likely, Chestnut Hill Square will have to create access through the site for traffic from Florence. The solution is incomplete because it does not provide access to Chestnut Hill Square from east along Florence. And, it cuts off access to the Newton side of the neighborhood from Brookline and vice versa.

A more complete solution is possible. The Chestnut Hill Square frontage along Florence Street is long and the Chestnut Hill Square site is a completely open canvas. There are few limitations.

Imagine rerouting Florence Street north into Chestnut Hill Square. (It would probably require moving some or all of the residences onto the south side of the new Florence and figuring out a way to get into the existing homes along Florence. Details.) Make the route through Chestnut Hill Square circuitous or otherwise an unfit cut-through.

Maybe a roundabout at a Florence Street entrance to Chestnut Hill Square would discourage cut-through traffic.

There has to be a better option than living with cut-through traffic or creating a dead end.

Previously: Florence Street kink

Read More...

Tuesday, March 27, 2007

Planned Business District Public Hearing

I'll post something on thegardencity.net about the public hearing generally, but here are a couple of key thoughts that relate to streets and sidewalks.

Srdjan Nedeljkovic made the excellent point that we ought to expect and demand that developers make equivalent commitment to roadway and transit improvements. This is consistent with the Boston Metropolitan Planning Organization's Journey to 2030 recommended investment allocation for the region as a whole.

New England Development proposes $13.5 million in roadway improvements. Imagine what we do with $13.5 million in transit improvements in the Chestnut Hill area? Imagine what we could do with $6.5 million in transit improvements and scaled back roadway improvements?

Dani Krasa made the excellent point that widening Route 9 is an active disencentive to invest in mass transit. Making extra lanes lets all parties involved postpone the hard choices about and the investment in mass transit on the corridor. If we don't widen Route 9, New England Development (and future developers) will find it in their interest to make meaningful transit improvements (and lobby for the state to make them). It'll be the only way to bring warm bodies to the property.

Read More...

Monday, October 18, 2010

Chestnut Hill Square -- Pedestrian Connection A

The northeast corner of the Chestnut Hill Square lot is a good measure of New England Development's commitment to pedestrians. It's not great.

There is potentially meaningful pedestrian traffic to that corner: from Avalon, from the apartment buildings on Hammond Pond Parkway, from next door at Barnes & Noble and Milton's. Yet, there is no sense of the corner as a gateway or main entrance to the site. This is in striking comparison to the northwest corner, which is treated like a gateway, largely because it's the corner that motorists are likely to see.

It appears that the principal route is meant to be along Boylston St./Route 9 to the entrance/exit, along the side of the north retail building, and onto the retail sidewalk. (Avalon is to the left in the bottom of the following diagrams.)



It would be better if there were only a single lane of traffic to cross (A). But, at least there's a pedestrian refuge. There doesn't appear to be very good sight lines for cars coming off Boylston turning left into the site (B). So, that crossing might be a bit hairy.

But, once across the entrance/exit, pedestrians are ill-treated. It's a mean little sidewalk with no street trees or other vegetation to separate people from cars (C). It takes the pedestrian past first the building dumpster (D) and then the building loading dock (E).

It seems likely that pedestrians may choose to take a slightly more direct, and likely safer route.



While there is no crosswalk at A, it's not likely to have a lot of traffic. There's no refuge at B, but cars will undoubtedly be going slower than they would at the corner above (also B).

Taking this route, pedestrians avoid the dumpster, but not the loading dock (C).

As with the "main" route, there is a distinct lack of green -- trees, lawn, bushes.

The most successful aspect of this corner is the direct connection to the Barnes & Noble and Milton's sidewalk. To New England Development's credit, they have not created any obstacles to connection with neighboring properties (even if they haven't exploited all the potential).



There's a nice crosswalk from sidewalk to sidewalk (A). But, pedestrians will still have to cross in front of the loading dock (B).

Recommendations:

In an ideal world, the retail space would be facing Boylston Street, and this would be a whole different design. (More on that in a later post.) But, given this retail configuration, this entrance to the site needs to be safer, more comfortable, and more attractive for pedestrians. Specifically:

  • Open up the east end of the north building with an entrance similar to the west entrance

  • Wider sidewalks

  • Green -- trees, lawn, shrubbery -- between the sidewalk and the street

  • A crosswalk across the Milton's lot entrance (A in the middle diagram)

  • Raise the crosswalk across the driveway (A in the last diagram)

  • Better camouflage the dumpster and the loading dock

Read More...

Wednesday, October 27, 2010

Chestnut Hill Square -- Pedestrian Connection G



The best connection of the proposed site is at the northwestern corner. Not coincidentally, it's also the most prominent corner for visitors arriving by car. But, there are still serious unmet challenges to good pedestrian access and circulation.



Ideally, the retail in the north building would have Boylston St./Rte. 9 as its front. Barring that, getting to the north retail (E) from the northwest corner is as direct as it could be. A to D is a straight line. The walk along from D to E isn't short, but it promises to be a much more friendly path than it's northeast counterpart.



There is a substantial entrance at D. The entrance at D seems designed to catch the attention of drivers, but it provides a collateral benefit to pedestrians. A building front, with glass and doors, is much more hospitable to pedestrians than the building's back. Plus, there's no dumpster or loading dock along this side of the building. And, of course, pedestrians can enter at least one store right at D!

What's definitely not good is the sidewalk in front of David's (B). Currently, there is a very wide shoulder and a very wide grass berm between the sidewalk and traffic. When New England Development is done with its widening, the only thing between pedestrians and traffic will be a measly 2' shoulder. Again, New England Development is making things substantially worse for pedestrians. Pedestrians need more room than a bare-minimally ADA compliant 5' wide sidewalk and a tire-width shoulder.




Also unfortunate, there is no way to get directly from the northwest corner to the residental/retail building (F). A nice direct path would be along the Capital Grille property. All that's missing is a paved section at G and a crosswalk at H. Given how direct this path is, it's hard to imagine that people won't use it, even without a paved section or crosswalk.



Another option would be to provide a sidewalk on the west side of the main driveway (I) and a crosswalk across the residential/retail building's driveway (J). Because the sidewalk along B is so crummy and because the path along the Capital Grille is so much better, this is an much less attractive alternative.

What's to be done here?

  • Make the sidewalk in front of David's no worse than it is now. There should be an equally wide grass berm. While there's no way that the shoulder will be as wide, the developer should compensate with some street trees.

  • Make the connection along the Capital Grille building. A small section of sidewalk and a crosswalk will pay big dividends.

Read More...

Saturday, January 8, 2011

How the aldermen helped kill the Atrium

The Atrium has a bunch of flaws*, but when you ask people why they don't like to shop there, the number one complaint is parking. Not "they don't have any stores I like." Parking. It was parking when there was William-Sonoma and other now gone stores were there. It was parking when the economy was humming along.

Parking. Parking. Parking.

People hate it.

But, when you consider the Atrium from a land-use perspective, the number one thing it's got going for it is parking. It's a building with over 100,000 square feet of retail space and around 20 surface parking spaces. It's a giant parking structure with a few stores above it. By comparison, the first phase of Chestnut Hill Square is going to have just under 250,000 sq. ft. and 699 surface parking spaces. To be fair, the planned but not guaranteed second phase will have a 300+ space parking garage when the 90-100 residential spaces are built. And, the second phase will eliminate about 100 surface spaces. But, in the end it'll be about 600 surface spaces.

So, what's the board got to do with this?

In a not-even-perfect world, we'd have a lot more structured parking. Surface parking encourages sprawl, creates run-off problems, &c. But, structured parking is at least marginally less appealing for shoppers who drive. So, a mall -- like Chestnut Hill Square or the Mall at Chestnut Hill -- will be a more appealing option than something like the Atrium, which is served almost exclusively by a parking garage. When Land Use and then the full board capitulated to New England Development's one-less-surface-space-and-we-walk threat**, they not only doomed Chestnut Hill Square from a land-use perspective, but they made things worse for the Atrium in this particular regard. It's not only a competing mall within spitting distance, it's a competing mall with more surface parking.

Obviously, this is a regional problem. Making more structured parking at Chestnut Hill Square wouldn't undo the attraction of the surface parking at the Mall at Chestnut Hill or the Chestnut Hill Shopping Center or any of the dozens of surface-parking surrounded shopping options in the area. But, it sure would have been nice if the board had not reduced the incentive to provide structured parking.

* Pedestrian access across the front is awful. The wall along Florence Street is inhospitable. No open space. Possibly even not enoughsurface parking.

** The irony, of course, is that New England Development built the Atrium and it's underground parking garage, which undoubtedly cost 2 or 3 times per parking space what an above-ground garage would cost, and built it with far more capacity then has ever been met by demand.

Read More...

Monday, November 15, 2010

CHS -- Allow parking on Boylston?

According to New England Development, one of the major constraints on the Chestnut Hill Square proposal was a prohibition against parking along Boylston St. (Rte. 9). It makes sense. Parking in the front setback (the area between the street and the front of the building) is a big no-no. It deadens the street and makes it pedestrian-unfriendly (if not hostile). Just about any big-box retail suffers from parking in the front setback.

But, keeping parking off of Boylston St. has some particular consequences for Chestnut Hill Square that may be worse than allowing it.

The intention of the restriction against parking in the front setback is to have new development engage the street and create a retail streetscape. But, for reasons good and bad, the developer was never going to put storefronts on Boylston St. And, because of the depth of the site, the developer understandably wants to have multiple retail fronts.



So, the retail in Chestnut Hill Square faces inward. And, Boylston St. gets the back of a building hard up against the street, with a narrow sidewalk (orange). There's a huge parking lot to navigate to get from the north retail building to the south buildings (green). And, there's a dangerous crossing to get from the north building to the west residential/retail building (red).

Since we're not going to get retail along Boylston St., maybe it's a good idea to relax the no-parking-in-the-front-setback restriction and reduce or eliminate the worst problems of this design.

If the north building and the sea of parking simply switched places, the design would get a whole lot better -- even with the blight of a parking lot along Boylston St.



The retail buildings would all be close together and the circulation area much more compact and easily navigated by foot (orange). The crossing between the north retail building and the west residential/retail building would be much safer (A). And, there would be an opportunity for wider, tree-lined sidewalk along Boylston St. (green).

Take it a step further and divide the north building in two.



Keep the idea of a mid-parking lot sidewalk (D), to connect from the sidewalk on Boylston St. to create a nice pedestrian spine through the development (B). Passage from the Milton's building to the east (C) and the residential/retail building (A) would be much safer.

Ironically, this configuration makes retail entrances along the north side of the building attractive to tenants (shown in orange along with retail along the gap), so there might end up being parking in the front setback after all. But, given the peculiarities of the site, it may be a compromise worth making.

We're not going to get the ideal development -- one that engages Boylston St. But, we can get a better development.

Read More...

Sunday, October 31, 2010

Chestnut Hill Square -- designed in danger


Probably the key connection in the entire Chestnut Hill Square plan is a connection not made: the connection between the north retail building (A) that runs along Boylston St./Rte. 9 and the residential/retail building (B) to the south and east.

In its pedestrian circulation plan (the image above), New England Development has not include a crossing between the two buildings. While it seems odd to leave out such a short and obvious crossing, it's a matter of safety: a crosswalk there would be too close to the development entrance.


Omitting a crossing, NED is proposing that people wishing to go from A to B will go south through the parking lot to the south retail, cross two driveways, and walk down the residential retail building. In fact, one of three things will happen, two of them bad. As NED hopes, some people will take the long march, which will keep them on foot, in the development, and a little healthier. More likely, people will be put off by the hike and not go to both spots in the same trip, which is bad for the development.


But some people will act like pedestrians often do, and simply cross the driveway. While pedestrian accommodations encourage walking, the lack of accommodations don't necessarily prevent walking. For an illustration of this truth, just wait a few minutes along any major street in Newton when sidewalks full of snow force people on foot into the road.

By creating demand for a crossing at a spot that they say is too dangerous to provide a crossing, NED has designed in a dangerous situation. The developer ought to be obligated to eliminate the danger.

Fortunately, the solution seems to be straightforward: create an overlap between the north retail building and the residential/retail building farther away from the development entrance, by moving the north retail building south (into the site), making the north retail building deeper, by creating a deeper sidewalk-cum-pedestrian plaza, or some combination of all three. Moving the whole building south is consistent with providing a better sidewalk along Boylston. Making the building deeper is consistent with breaking the two buildings into one to relieve the blank facade along Boylston.

But, somehow, NED has to connect the dots.

Read More...

Friday, February 9, 2007

Extension of the MBTA #60 bus

Looks like the #60 bus has been extended (PDF) to add a new stop at the Mall at Chestnut Hill, just west of the new Bloomingdale's women's store. The new route eliminates the stop under the Route 9 overpass. (Tip from Adam Peller.)

I'm not a transit-junkie and don't pretend to have a grasp on the nuances of individual bus routes. It appears to me that the change corresponds to the Bloomingdale's women's store move. It used to stop near Bloomingdale's. Bloomingdale's moved. Now it stops near Bloomingdale's new location. Maybe it's just coincidence.

But, it does have some interesting implications for the Chestnut Hill Square project. One of the changes New England Development promised in the Final Environmental Impact Report was to work with the MBTA and the Mall at Chestnut Hill to extend the route. Check that one off the list.

The route change also bears on the pedestrian bridge. One possible use case supporting the bridge was people working or shopping at the Mall at Chestnut Hill and using the pedestrian bridge to get to the Chestnut Hill Square bus stop. This assumes that the bus would not stop on the north side of Route 9.

Unless the MBTA eliminates this new stop, that use case vanishes. And, there's nothing about the bus route, the proposed changes to Route 9, or the pedestrian bridge that suggests that the MBTA would or should change the route.

It doesn't make sense to me that they would eliminate a stop at the Mall at Chestnut Hill in favor of the proposed Chestnut Hill Square stop when getting from the Mall to the CHS stop would involve crossing the parking lot and the pedestrian bridge and then getting down a flight of steps or an elevator. Especially when eliminating the Mall stop only saves the loop through the Mall parking lot.

But, what do I know?

Note: Adam wonders why the bus, having negotiated the Langley jug-handle, doesn't stop at the Atrium. I suspect because they don't have the space in the driveway. Also, Simon has a new shuttle between the Atrium and the Mall at Chestnut Hill, making it possible for Atrium shoppers and workers to use the bus. (I wrote "shoppers and workers" because it seems proper to do so. But, seriously, who's taking the bus and a shuttle to shop at Tiffany's or get a Greta Cole manicure?)

Read More...

Wednesday, December 26, 2007

Chestnut Hill Square nuggets

Two end-of-the-year thoughts about Chestnut Hill Square:

Some people think that we should think of Boylston Street as a state highway (which it is) and plan accordingly, which means no worrying about the pedestrian streetscape. The logical extension of that argument is to leave the artery as it is and not create new intersections, which naturally limit the artery's effectiveness as an artery. But, a new intersection is exactly what New England Development is planning, namely a new median break and signal.

Maybe one answer is to not worry about throughput on Boylston Street and to add more, not fewer, intersections to promote access to the north and south sides of the street. Make it more like Beacon Street in Brookline.

Over on the Garden City, I wrote that Alderman Gentile and others were not acting as NIBMYs limiting the Planned Multi-Use Business Development to major arterials (Boylston Street) ... that they were NOMMAs instead.

On a more serious note, when you're talking about significant effects on traffic, it's tough to be a NIMBY. When it comes to traffic, we are all abutters. If Chestnut Hill Square increases volume on Boylston Street significantly, it's likely that traffic will divert to Beacon Street and, possibly, Commonwealth Avenue.

Read More...

Wednesday, October 3, 2007

Three generations of cutters-through

Tonight, Brookline held a public hearing on a proposal to close Heath Street somewhere between Heathwood and Arlington. Closing Heath Street would make Heath and Florence Streets dead ends, until and unless New England Development created a street that connected Florence to Route 9 through Chestnut Hill Square.

The problem is cut-through traffic, not traffic that would travel to Chestnut Hill Square along Florence or Heath. Chestnut Hill Square is designed so that there is access from Florence only to the apartment building on the south side of the site (a mistake for a host of reasons). Chestnut Hill Square's contribution to the -- already existing -- problem is the traffic that it will add to and back up Route 9. The more backed up Route 9 is, the more attractive the Florence/Heath cut-through is. Also, Chestnut Hill Square will introduce two new lights for traffic to contend with: in front of the development and at Hammond Pond Parkway (which one assumes will have allow right turn on red).

A fundamental cause of the cut-through problem -- existing and future -- is the design of Florence and Heath. They describe an almost perfect diagonal from the Route 9 at Florence to Heath at Hammond Pond Parkway. It's no wonder that one of the Brookline selectman described how he was a third-generation cutter-through.

Here are three alternatives to closing Heath Street:

  • Put a kink in Florence Street right in front of the apartment building. The current design has a bit of open land between the apartment building driveway and Florence Street. Use that space to reshape Florence from a smooth curve to a sharper turn or two. This is something that can be introduced and tried now.
  • Extend Louise Road into the development and provide access to the entire site from Florence. Ironically, protecting the neighborhood from the traffic in and out of the site may contribute to more traffic trying to bypass the site. A light at a Louise Street entrance into the site might discourage more cut-through traffic than it generates.
  • Focus on making Florence and Heath Streets pedestrian friendly. Sidewalks, wide shoulders, narrow travel lanes, raised crosswalks would all mitigate the effect of the traffic, may slow it, and may even . Go really crazy and lower the design speed to 20 mph with horizontal and vertical deflection.

Read More...

Tuesday, February 5, 2008

What's up at the Mall?

Neighbor Adam makes a great observation about the Mall at Chestnut Hill: in the recent renovations, they took out the staircase. (The children of NS&S lament the related loss of the "penny fountain.")

It's not a good sign that there's no way to self-propel oneself from one floor to the next (unless you go outside). Escalators. Elevators. But, no stairs.

Speaking of the MaCH, on a recent visit, I noticed a bunch of empty store fronts. I only hope that means a change of tenants and not a shortage of tenants. I'm not a big fan of the MaCH, but a healthy mall is better for the city.

But, I'm not sanguine. The economy's going downhill and new stores are opening at the Natick Collection. I'm not sure that a super-regional mall in Newton is going to survive, even if anchored by the apparently wildly successful Bloomingdales store.

What does that mean? Expect that Simon (the MaCH owners) to propose a Planned Multi-Use Development (like what New England Development is proposing right across the street). They wouldn't have to tear down the mall, they could build the housing around it.

It also makes me wonder about the viability of Chestnut Hill Square. Make no mistake, with the right kind of changes, Chestnut Hill Square is a lot better than most of the alternatives. But, will it make sense to build a new mall across from a struggling mall in a recession?

Read More...

Tuesday, March 27, 2007

Demands on Parker Street

The Route 9/Parker Street overpass is already the subject of study by the city and New England Development (and their respective traffic consultants) because of the effect on the interchange of of increased Route 9 traffic from Chestnut Hill Square.

The scope of study (and potential improvements) needs to be expanded in light of news that the Sam White property (on the south side of Route 9 just east of Parker Street) is going to be developed, likely as affordable housing, pursuant to 40(b).

This significantly changes the dynamic on the interchange. With development on the Sam White property, there will be an undoubtedly large increase in the number of motorists using Parker Street to perform an east-to-west U-turn. That is, westbound traffic coming from the east of Parker Street that will have to go up the westbound off-ramp to Parker Street, turn left on Parker Street (after crossing the northbound traffic lane), then turn left down the eastbound on-ramp (again crossing the northbound traffic lane).

The accumulation of the following factors make it seem like a good opportunity to rethink the whole interchange design and not invest in relatively minor changes (like traffic signals) that address only one source of concerns:

  • The apparently deteriorating condition of the bridge
  • The increased volume to be generated by Chestnut Hill Square
  • The increased volume to be generated by development on the Sam White property
  • The significant bike and pedestrian problems

Considered more broadly, the area needs a better bicycle/pedestrian connection from the north to the south, not only along Parker Street. Both Bowen School and the South/Oak Hill complex are east of Parker, between Parker and Langley. Perhaps a master plan for the Langley to Parker section could include pedestrian access across Route 9 between the two major intersections.